SWIMMING POOL DROP AND VAC CLEAN UP (NO DRAINING)UP TO 70000LT

R4,500.00

EXTREME Pool Recovery  – We can help, challenge accepted

Normally pools standing a period of time not exceeding 6 months .Pools neglected during construction. Pools where drain and acid wash cannot be performed.

VISUAL:
Pool is deep green to brownish incudes heavy floating algae

Floating leaves and debris (slimy and decaying debris)
Shallow end bottom of pool cant be seen
Deep end bottom of pool cant be seen
Dark algae  and possible black algae on walls
Heavy  sediment on floor of pool ( sludge or decaying debris)
Water level  is either below weir or over filled

TREATMENT:
Thorough brushing of pool walls and floor and removal of most floating debris
Dredging of floor using leaf rakes and removing as much settlement as possible
Cleaning of baskets in pool weir and pump
Filling water to run pump and circulate water
Water test
Balancing of water {adding Acid and Alkalinity etc)
Broadcasting of a flocculant and leaving pool to stand switched off for min 1 day
client to fill water to the highest level
First vacuum filling up pool as required , vacuum will be intermediate while waiting for pool
to fill as vacuum will be on waste.
Possible second round of flocculant and vacuum (cost not included and determined after first floc)
Backwashing and second brushing of pool interior, cleaning of baskets
Re-test water
Broadcasting of shock treatment and algaecide
Backwashing cleaning of baskets and and final vacuuming of pool
Adjusting of sanitizer and changing of filter sand (sand change included but subject to filter inspection)
Adding water clarifier and handing over to client.

SWIMMING POOL DROP AND VAC CLEAN UP (NO DRAINING)UP TO 70000LT

R4,500.00

error: Content is protected !!
This site uses cookies to offer you a better browsing experience. By browsing this website, you agree to our use of cookies.