SWIMMING POOL DROP AND VAC CLEAN UP (NO DRAINING)UP TO 70000LT

SWIMMING POOL DROP AND VAC CLEAN UP (NO DRAINING) UP TO 70000LT.

This service is specifically designed for pools up to 70,000 liters, challenging the traditional methods by offering an efficient solution without the need for draining. It’s an ideal approach for pools that have been neglected for up to six months, including those affected by construction work or where drain and acid wash treatments are not viable options.

Visual Assessment:

The condition of the pool before treatment often presents several challenges:

  • The water appears deep green to brown, indicating a severe algae bloom.
  • The surface is cluttered with floating leaves and debris, which are slimy and decaying.
  • Visibility is compromised in both the shallow and deep ends, with the bottom of the pool obscured.
  • The presence of dark algae, including stubborn black algae, is noticeable on the pool walls.
  • A thick layer of sediment, consisting of sludge or decaying debris, covers the pool floor.
  • The water level is inconsistent, either falling below the weir or being overfilled.

Comprehensive Treatment Process:

  1. Initial Cleanup: The process starts with a thorough brushing of the pool’s walls and floor, aiming to dislodge algae and sediment. This step also involves removing most of the floating debris to clear the water surface.
  2. Sediment Dredging: Using leaf rakes, the team meticulously dredges the pool floor to remove as much sediment as possible. This step is crucial for reducing the amount of debris and preparing the pool for further cleaning.
  3. Filtration System Maintenance: The baskets in the pool weir and pump are cleaned to ensure optimal water flow and filtration efficiency during the cleaning process.
  4. Water Circulation and Testing: Water is added as needed to enable the pump to circulate water effectively. A comprehensive water test follows to determine the pool’s chemical balance and identify the necessary adjustments.
  5. Chemical Balancing and Flocculant Application: The pool’s water chemistry is adjusted, typically involving the addition of acid and alkalinity regulators. A flocculant is then distributed across the pool, and the system is turned off for a minimum of one day to allow the flocculant to settle the suspended particles to the bottom. It is up to the client to ensure the pool is filled to the highest recommended level during this period.
  6. Vacuuming and Debris Removal: The initial vacuuming process is conducted as the pool fills, operating on waste mode to prevent circulating the unsettled debris. Depending on the condition after the first flocculation, a second round may be necessary, entailing additional costs.
  7. Post-Treatment Cleaning: This includes backwashing the filter, a second brushing of the pool’s interior, and cleaning the baskets to ensure a thorough cleanup.
  8. Final Water Treatment: After re-testing the water, a shock treatment and algaecide are broadcasted to eliminate any lingering algae and pathogens. This is followed by another round of backwashing and the final vacuuming to ensure the pool is clean.
  9. Sanitization and Filter Maintenance: Adjustments are made to the pool’s sanitizer levels, and the filter sand is changed if necessary (subject to filter inspection).
  10. Clarification and Handover: A water clarifier is added to enhance the clarity of the pool water. The pool is then ready to be handed back to the client, with the water looking crystal clear and inviting.

This service promises not just a temporary fix but a comprehensive recovery, turning even the most neglected pools into pristine waters ready for enjoyment.

error: Content is protected !!
SWIMMING POOL DROP AND VAC CLEAN UP
SWIMMING POOL DROP AND VAC CLEAN UP (NO DRAINING)UP TO 70000LT
This site uses cookies to offer you a better browsing experience. By browsing this website, you agree to our use of cookies.